A defined and scheduled period of time by which workload will be migrated.
The smallest unit of work (components, applications, services or function) that should be moved together.
A planning item that details when a business function is able to be moved.
The method or strategy used to transition or move workload. This can be things like V2V (Virtual to Virtual), FL (Forklift or a physical move), MW (Move Workload such as a logical partition move), SWAP (an asset swap), LF (Leap Frog – where you pre-stage some new and move capacity bit by bit), etc.